Installing a stove in a standard chimney breast involves removing the existing surround, plastering out the opening, lining the chimney, laying hearth and installing stove.
This is usually a 3-4 visit job.
Installing a stove in a standard chimney breast involves removing the existing surround, plastering out the opening, lining the chimney, laying hearth and installing stove.
This is usually a 3-4 visit job.